5-4 | IPS-4-UV Analyzer-GPDiv2
Frequency Task
Monthly
Pressure Readings
Check the Aspirator, Pneumatic Valve/Zero, and Manifold pressure
readings from the
STATUS
screen.
Aspirator pressure should be set higher than 70 kPa (10 psi) above
the sample stream pressure.
Pneumatic Valve/Zero supply pressure should be set in the range
of 420–560 kPa (60–80 psig), typically 560 kPa (80 psig) for high
pressure applications. For the Zero supply, the pressure should be
set to approximately 140 kPa (20 psig) above the sample stream
pressure.
Manifold pressure should be set approximately 560–700 kPa
(80–100 psig). Refer to “Adjusting the Sample Flow Rate” in Chap-
ter 3 for more details.
CAUTION:
To avoid damaging the pressure transducer, do not set the pressure
higher than the sample system rating
.
Every Three Months
Outdoor Systems
If your analyzer system is installed outdoors, check the condition
of the seals on the doors. These seals are essential in the analyzer
maintaining its IP65 and NEMA 4 rating.
The secondary gaskets (with the wire mesh) on the door are used
for electrical contact between each door and its enclosure. Ensure
these gaskets are intact.
If the seals are damaged, cracked, or show signs of wear, replace
them immediately. Contact AMETEK for assistance.
Every Six Months
Sheltered Systems
If your analyzer system is installed in a custom shelter, check the
air fi lters for the shelter purge and air conditioning systems and
replace them if necessary. Depending on the location of the site
and its environmental conditions, it may be necessary to check and
replace these fi lters more frequently.
Every Six Months
Sample/Vent Lines
Inspect the Sample Line and Vent Line for sags, sharp bends, or
damage to the outer skin. If necessary, take appropriate safety pre-
cautions and replace the lines. Perform a leak check on all associ-
ated fi ttings after replacing any line(s).
Every Year
Measuring Cell
Clean the Measuring Cell and the rest of the analyzer sample sys-
tem. This schedule is a minimum requirement. If other conditions
are found to be present, as outlined in this chapter under “Measur-
ing Cell Preventive Maintenance,” cleaning may be required more
frequently.
At the same time, replace the o-rings (always) and windows and/or
window/mirror combinations (if chipped, cracked, or scratched).
18–24 Months
Xenon Flash Lamp
Replace the lamp. The lamp may need to be replaced sooner if
information from the analyzer diagnostics indicates related alarms.
Refer to “Replacing the Xenon Flash Lamp Assembly” in this chap-
ter.
Содержание IPS-4-UV
Страница 15: ...Contents xv...
Страница 16: ...xvi IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 24: ...1 8 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 66: ...3 36 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 138: ...5 32 IPS 4 UV Analyzer GPDiv2 Figure 5 4 Over Temperature alarm Reset Switch S501 Relay board 100 1942...
Страница 144: ...6 6 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 180: ...A 2 IPS 4 UV Analyzer GPDiv2 Analyzer Light Path Schematic...
Страница 183: ...Appendix Drawings A 5 Detector Interface Board 100 1937...
Страница 184: ...A 6 IPS 4 UV Analyzer GPDiv2 Detector Board 100 1955...
Страница 185: ...Appendix Drawings A 7 Display Interface Board 100 1978...
Страница 186: ...A 8 IPS 4 UV Analyzer GPDiv2 Customer Connection Board 100 1971...
Страница 187: ...Appendix Drawings A 9 Relay Board 100 1942...
Страница 188: ...A 10 IPS 4 UV Analyzer GPDiv2 Analog Board 100 1922...
Страница 189: ...Appendix Drawings A 11 MCU Board 100 1914...
Страница 190: ...A 12 IPS 4 UV Analyzer GPDiv2 Xenon Lamp Board 100 2061...
Страница 191: ...Appendix Drawings A 13 Electronics Enclosure Wiring Diagram Sheet 1 of 3 WX 102877...
Страница 192: ...A 14 IPS 4 UV Analyzer GPDiv2 Electronics Enclosure Wiring Diagram Sheet 2 of 3 WX 102877...
Страница 193: ...Appendix Drawings A 15 Electronics Enclosure Wiring Diagram Sheet 3 of 3 WX 102877...
Страница 194: ...A 16 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 196: ...S 2 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 200: ...G 4 IPS 4 UV Analyzer GPDiv2 g 1035 17 32 Not used 1036 Not used 1037 Not used 1038 Not used 1039 Not used...