3-14 | IPS-4-UV Analyzer-GPDiv2
Installing and Connecting the Instrument Air/Zero Fluid Line
Instrument Air or Nitrogen can be used as the aspirator/pneumatic valve
drive fluid and to zero the analyzer. This procedure assumes Instrument
Air is being used for these functions. The procedure is the same, regard-
less of which medium is being used.
The customer supplies the Instrument Air/Zero fluid line. The tubing
must be 1/4” O.D. 316 stainless steel tubing with appropriate 1/4” tube
connectors.
If using Instrument Air:
• The Instrument Air must meet the ANSI/ISA-7.0.01 (1996) specifica-
tions at all times. If the Instrument Air cannot meet these require-
ments, an inlet filter system must be installed.
• The air must be supplied to the analyzer pressure regulator at a pres-
sure of 490–700 kPag (70–100 psig / 4.8–6.9 barg). Pressure require-
ments may vary, depending on the application; refer to customer-spe-
cific drawings located in the “Supplemental Information” tab of this
manual or the Documentation Package shipped with the analyzer.
If using N
2
:
• Use only ultrahigh purity (UHP) Nitrogen.
To install the Instrument Air (or Zero fluid) line:
1. Route the line from the Instrument Air/Zero fluid supply to the ana-
lyzer.
2. Before connecting it to the analyzer, blow down (purge) the line to
remove any liquids or particulate that may be present in it.
3. Connect the line to the Instrument Air/N
2
supply and to the analyzer.
The plumbing for purge systems and the Instrument Air/N
2
feed
through the analyzer manifold is already made by AMETEK.
Содержание IPS-4-UV
Страница 15: ...Contents xv...
Страница 16: ...xvi IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 24: ...1 8 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 66: ...3 36 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 138: ...5 32 IPS 4 UV Analyzer GPDiv2 Figure 5 4 Over Temperature alarm Reset Switch S501 Relay board 100 1942...
Страница 144: ...6 6 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 180: ...A 2 IPS 4 UV Analyzer GPDiv2 Analyzer Light Path Schematic...
Страница 183: ...Appendix Drawings A 5 Detector Interface Board 100 1937...
Страница 184: ...A 6 IPS 4 UV Analyzer GPDiv2 Detector Board 100 1955...
Страница 185: ...Appendix Drawings A 7 Display Interface Board 100 1978...
Страница 186: ...A 8 IPS 4 UV Analyzer GPDiv2 Customer Connection Board 100 1971...
Страница 187: ...Appendix Drawings A 9 Relay Board 100 1942...
Страница 188: ...A 10 IPS 4 UV Analyzer GPDiv2 Analog Board 100 1922...
Страница 189: ...Appendix Drawings A 11 MCU Board 100 1914...
Страница 190: ...A 12 IPS 4 UV Analyzer GPDiv2 Xenon Lamp Board 100 2061...
Страница 191: ...Appendix Drawings A 13 Electronics Enclosure Wiring Diagram Sheet 1 of 3 WX 102877...
Страница 192: ...A 14 IPS 4 UV Analyzer GPDiv2 Electronics Enclosure Wiring Diagram Sheet 2 of 3 WX 102877...
Страница 193: ...Appendix Drawings A 15 Electronics Enclosure Wiring Diagram Sheet 3 of 3 WX 102877...
Страница 194: ...A 16 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 196: ...S 2 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 200: ...G 4 IPS 4 UV Analyzer GPDiv2 g 1035 17 32 Not used 1036 Not used 1037 Not used 1038 Not used 1039 Not used...