Use of the implement
176
Centaya Super BAH0092-6 10.20
5. Instruct any people in the area to stand at a minimum distance of 20 m from the implement.
6. Release the transport lock for the track markers,
see "Soil tillage implement" operating manual.
7. Switch on the control terminal, see "Control terminal" operating manual.
8. Move the track markers into working position, see page 160.
9. Calibrate the working position (A) and
transport position (B) on the field
with ISOBUS system, see
"ISOBUS software" operating manual
with seed tube monitoring, see
"Seed tube monitoring" operating
manual.
The settings can be made so that the electric
motor that drives the metering roller
starts rotating as soon as the seed drill
coulters penetrate into the soil.
comes to a stop as soon as the seed
drill coulters come out of the soil.
Fig. 226
10. Run the fan up to nominal speed ....................................................................................... Page 140
11. Actuate the tractor control unit (yellow):
Lower the active track marker
Advance the tramline control
Creation of tramlines (if required)
Lowering the tramline marker (if necessary).
12. Set the tramline counter just before commencing the first field run,
see "ISOBUS software" operating manual
see "AmaDrill 2" operating manual.
13. Run the PTO shaft of the soil tillage implement up to operating speed
see "Soil tillage implement" operating manual.
14. Start off and lower the combination using the tractor's three-point hydraulic system.
Pull the implement forward slightly, immediately before lowering the
tools into the ground.
Particularly with double disc coulters, this prevents blockage or damage to
the seed catcher (see section 12.6.4, page 205).
Never drive in reverse when the coulters are already in the soil.
Содержание Amazone Centaya 3000 Super 1600
Страница 2: ......
Страница 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Страница 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Страница 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Страница 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Страница 220: ......
Страница 221: ......