Centaya Super BAH0092-6 10.20
7
6.1.1.7
Table .................................................................................................................................... 107
6.2
Secure the tractor / implement against unintentional starting and rolling away ................. 108
6.3
Hydraulic connection for the fan drive ................................................................................. 109
7
Coupling and uncoupling the implement .............................................. 110
7.1
Hydraulic hose lines ............................................................................................................. 112
7.1.1
Coupling the hydraulic hose lines ........................................................................................ 112
7.1.2
Disconnecting the hydraulic hose lines ................................................................................ 113
7.2
Coupling and uncoupling implements .................................................................................. 114
7.2.1
Coupling - Tractor and soil tillage implement ....................................................................... 116
7.2.2
Coupling - Pack top seed drill and soil tillage implement .................................................... 117
7.2.3
Uncoupling – Combination from the tractor ......................................................................... 121
7.2.4
Uncoupling – Soil tillage implement and pack top seed drill ................................................ 122
7.3
Connecting the FTender on the 2nd distributor head .......................................................... 126
8
Settings ..................................................................................................... 128
8.1
Folding the steps up and down ............................................................................................ 129
8.2
Fill the seed hopper ............................................................................................................. 131
8.3
Calibrating the seed rate ...................................................................................................... 134
8.4
Adjusting the fan speed ....................................................................................................... 140
8.4.1
Setting the fan speed via the flow control valve of the tractor ............................................. 141
8.4.2
Setting the fan speed on tractors without flow control valve ................................................ 141
8.4.3
Switching on the fan speed monitoring ................................................................................ 141
8.4.4
Pressure relief valve with round outer contour .................................................................... 142
8.4.4.1
Basic setting of the pressure relief valve ............................................................................. 142
8.4.4.2
Fan speed setting ................................................................................................................ 142
8.4.5
Pressure relief valve with hexagonal outer contour ............................................................. 143
8.4.5.1
Basic setting of the pressure relief valve ............................................................................. 143
8.4.5.2
Fan speed setting ................................................................................................................ 143
8.5
RoTeC-Pro Control coulter .................................................................................................. 144
8.5.1
Adjusting and checking the seed placement depth ............................................................. 144
8.5.1.1
Adjusting the depth control discs / wheels ........................................................................... 145
8.6
TwinTeC double disc coulter ................................................................................................ 147
8.6.1
Adjusting and checking the seed placement depth ............................................................. 147
8.7
Coulter pressure, seed rate increase, and coulter lift (all coulter types) ............................. 151
8.7.1
Coulter pressure .................................................................................................................. 151
8.7.2
Seed rate increase ............................................................................................................... 152
8.7.3
Coulter lift - Soil tillage without seeding ............................................................................... 153
8.7.4
Min./max. pressure stages: Coulter pressure and seed rate increase ................................ 154
8.7.5
Min./max. pressure stages: Coulter lift ................................................................................ 154
8.8
Adjusting the exact following harrow ................................................................................... 155
8.8.1
Adjusting the exact following harrow tines ........................................................................... 155
8.8.2
Adjusting the exact following harrow pressure .................................................................... 156
8.8.3
Moving the exact following harrow to the working/transport position .................................. 157
8.8.3.1
Move the exact following harrow into working position ........................................................ 157
8.8.3.2
Moving the exact following harrow into transport position ................................................... 157
8.8.4
Seeding without exact following harrow (exact following harrow lift) ................................... 157
8.9
Adjusting the roller harrow ................................................................................................... 158
8.10
Moving the track marker to the working / transport position ................................................ 160
8.11
One-sided switching ............................................................................................................. 161
8.11.1
One-sided switching - Installing an insert ............................................................................ 161
8.11.2
One-sided switching - Lever actuation ................................................................................. 162
8.11.3
One-sided switching - setting on the control terminal .......................................................... 162
8.12
Tramline marker with implement frame fastening ................................................................ 163
8.12.1
Moving the tramline marker to working position .................................................................. 163
8.12.2
Moving the tramline markers to the transport position ......................................................... 164
8.13
Tramline marker with exact following harrow fastening ....................................................... 165
8.13.1
Move the tramline marker to working position ..................................................................... 165
8.13.2
Move the tramline markers to the transport position............................................................ 166
Содержание Amazone Centaya 3000 Super 1600
Страница 2: ......
Страница 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Страница 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Страница 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Страница 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Страница 220: ......
Страница 221: ......