Loading and unloading the implement upon delivery
Centaya Super BAH0092-6 10.20
33
3
Loading and unloading the implement upon delivery
The pictogram marks the location at which the
slings for lifting the implement with a crane is to
be secured.
Fig. 5
DANGER
Attach the slings for loading the
implement with a crane only at the
marked locations.
DANGER
Compliance with this information is essential for your safety:
Only load the implement when it is mounted on the soil tillage
implement. It is not permitted to load the implement while it is
standing on the parking supports.
Load the implement only when the hopper is empty
Please pay attention to the required tensile strength of the sling
Do not walk under suspended loads
Lash the implement down on the transport vehicle in accordance
with regulations.
Only load the pack top seed drill when it is
mounted on the soil tillage implement and the
roller.
For loading with a crane, select the length of the
sling (Fig. 6/1) so that there is no chance of the
sling making contact, in particular with the seed
hopper.
Fig. 6
Содержание Amazone Centaya 3000 Super 1600
Страница 2: ......
Страница 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Страница 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Страница 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Страница 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Страница 220: ......
Страница 221: ......