6
Centaya Super BAH0092-6 10.20
5.3.2
AMAZONE TwinTerminal ...................................................................................................... 56
5.4
Implement documentation ..................................................................................................... 57
5.5
Central key ............................................................................................................................ 57
5.6
Hand wash tank ..................................................................................................................... 57
5.7
Distance measurement ......................................................................................................... 58
5.8
Seed hopper and loading board ............................................................................................ 59
5.8.1
Fill level monitoring ................................................................................................................ 60
5.9
Metering ................................................................................................................................ 61
5.9.1
Metering roller table - Figures ............................................................................................... 63
5.9.2
Table – metering rollers, seed ............................................................................................... 65
5.9.3
Calibrating the seed rate ....................................................................................................... 67
5.10
Fan ........................................................................................................................................ 70
5.11
Distributor head ..................................................................................................................... 72
5.11.1
Seed tube monitoring ............................................................................................................ 73
5.11.2
Spreading seed with wide row spacing ................................................................................. 73
5.12
RoTeC Pro Control coulter .................................................................................................... 74
5.13
TwinTeC double disc coulter ................................................................................................. 76
5.13.1
Seed placement depth .......................................................................................................... 78
5.14
Coulter pressure, seed rate increase, coulter lift (all coulter types) ...................................... 79
5.14.1
Coulter pressure .................................................................................................................... 79
5.14.2
Seed rate increase ................................................................................................................ 80
5.14.3
Coulter lift - Soil tillage without seeding ................................................................................ 81
5.15
Min./max. pressure stage (all coulter types) ......................................................................... 82
5.15.1
Coulter pressure and seed rate increase .............................................................................. 82
5.15.2
Coulter lift - Soil tillage without seeding ................................................................................ 82
5.16
Exact following harrow .......................................................................................................... 83
5.16.1
Exact following harrow tine position ...................................................................................... 84
5.16.2
Exact following harrow pressure ........................................................................................... 85
5.16.3
Exact following harrow lifting ................................................................................................. 86
5.17
Roller harrow ......................................................................................................................... 87
5.18
Seed pre-metering................................................................................................................. 88
5.19
Start-up ramp ........................................................................................................................ 88
5.20
Tramlines ............................................................................................................................... 89
5.20.1
Tramline rhythm, tabular determination ................................................................................ 92
5.20.2
Tramline rhythm, graphic determination................................................................................ 92
5.20.3
One-sided switching .............................................................................................................. 94
5.20.3.1
One-sided switching by installing an insert ........................................................................... 94
5.20.3.2
One-sided switching by actuating a lever ............................................................................. 95
5.20.3.3
One-sided switching by pressing a button on the control terminal ....................................... 96
5.21
Tramline marker .................................................................................................................... 97
5.21.1
Tramline marker with implement frame fastening ................................................................. 97
5.21.2
Tramline marker with exact following harrow fastening ........................................................ 98
5.22
Track marker ......................................................................................................................... 99
5.23
Camera system ................................................................................................................... 100
5.24
Work floodlights ................................................................................................................... 100
5.25
GreenDrill GD200-E ............................................................................................................ 101
6
Initial operation ........................................................................................ 102
6.1
Checking the suitability of the tractor .................................................................................. 103
6.1.1
Calculating the actual values for the total tractor weight, tractor axle loads and tyre
load-bearing capacity, as well as the required minimum ballast weight ............................. 104
6.1.1.1
Data required for the calculation (attached implement) ...................................................... 105
6.1.1.2
Calculation of the required minimum ballast weight at the front G
V min
of the tractor
to ensure steering capability ............................................................................................... 106
6.1.1.3
Calculation of the actual front axle load of the tractor T
V tat
................................................. 106
6.1.1.4
Calculation of the actual total weight of the tractor and implement combination ............... 106
6.1.1.5
Calculation of the actual rear axle load of the tractor T
H tat
................................................. 106
6.1.1.6
Load-bearing capacity of the tractor tyres ........................................................................... 106
Содержание Amazone Centaya 3000 Super 1600
Страница 2: ......
Страница 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Страница 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Страница 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Страница 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Страница 220: ......
Страница 221: ......