Use of the implement
Centaya Super BAH0092-6 10.20
177
10.6
During operation
10.6.1 Overview of the inspections
Time intervals
Inspections
Kapitel
Page
Inspection
after the first 30 to 50 m travelled at
working speed have been covered
after changing from light to heavy
soil and vice-versa
after setting the coulter pressure
hourly,
e.g. each time the seed hopper is
refilled
Only implements with
RoTeC Pro Control coulters:
after adjusting the depth control
discs/wheels
Check the seed
placement depth
with RoTeC-
Pro
8.5.1
144
with TwinTeC
8.6.1
147
Check the tillage intensity
of the exact following harrow
8.8
155
Check for and remove
any dirt
in the seed metering unit
in the seed hoses
in the fan suction guard screen
Check
After finishing work
Visual check of the distributor head
for impurities.
Impurities may block the distributor
heads and must be removed
immediately.
12.4.3
194
Содержание Amazone Centaya 3000 Super 1600
Страница 2: ......
Страница 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Страница 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Страница 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Страница 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Страница 220: ......
Страница 221: ......