Cleaning, maintenance and repairs
12.6
Replacing discs (workshop work)
Minimum disc diameter: 360 mm.
The discs are replaced with the implement folded
out.
Unscrew screws for replacing discs and re-
tighten afterwards.
12.7
Tine connection
Inspect the bolts of the tine connection for tight-
ness.
12.8
Checking the roller
•
Check the alignment of the bolts (1).
•
Check the bolts (1) for tightness.
•
Check the roller bearing (2) for ease of
movement.
Ceus-2TX BAG0183.2 01.19
111
Содержание Ceus 4000-2TX
Страница 104: ...Cleaning maintenance and repairs 12 2 Lubrication instructions Lubrication points 10 h 104 Ceus 2TX BAG0183 2 01 19...
Страница 105: ...Cleaning maintenance and repairs Lubrication points 50 h Ceus 2TX BAG0183 2 01 19 105...
Страница 106: ...Cleaning maintenance and repairs 106 Ceus 2TX BAG0183 2 01 19...
Страница 128: ...Hydraulic circuit diagram Hydraulic folding headland working position with guide wheel 128 Ceus 2TX BAG0183 2 01 19...
Страница 131: ...Checklist for using the implement Ceus 2TX BAG0183 2 01 19 131...
Страница 132: ......