Coupling and uncoupling the machine
Coupling the implement with the tensioned crosspiece
1. Slide ball sleeves onto the lower link pins of the implement and
secure them with linch pins.
2. Instruct persons to get out of the danger area between the trac-
tor and the implement.
3. Drive the tractor towards the implement.
4. Couple the lower links from the tractor seat.
→
The lower link hooks lock automatically.
5. Visually check to ensure that the lower link hooks are correctly
locked.
6. Lift the jack.
7. Couple the supply lines with the tractor.
8. Remove wheel chocks.
9. Disengage parking brake.
Country-specific regulation for implements without brake system:
10. Properly attach the safety chain to the tractor.
Coupling the implement with the ball bracket / drawbar eye
1. Instruct persons to get out of the danger area between the trac-
tor and the implement.
2. Drive the tractor in reverse towards the implement so that the
coupling device can be coupled.
3. Couple the supply lines with the tractor.
4. Couple the coupling device.
5. Set the control valve on the drawbar to position
.
6. Ball coupling: Actuate tractor control unit
yellow4
:
Position the ball bracket hydraulically on the tractor ball coupling
and lock it.
7. Actuate the
yellow4
tractor control unit.
→
Lift the implement using the drawbar controls.
8. Lift the jack.
9. Remove wheel chocks.
10. Disengage parking brake.
Country-specific regulation for implements without brake system:
11. Properly attach the safety chain to the tractor.
12. Set the control valve on the drawbar to position
.
13. If necessary, actuate the
yellow1, 2
tractor control unit.
→
Adjust the ground clearance via the running gear.
80
Ceus-2TX BAG0183.2 01.19
Содержание Ceus 4000-2TX
Страница 104: ...Cleaning maintenance and repairs 12 2 Lubrication instructions Lubrication points 10 h 104 Ceus 2TX BAG0183 2 01 19...
Страница 105: ...Cleaning maintenance and repairs Lubrication points 50 h Ceus 2TX BAG0183 2 01 19 105...
Страница 106: ...Cleaning maintenance and repairs 106 Ceus 2TX BAG0183 2 01 19...
Страница 128: ...Hydraulic circuit diagram Hydraulic folding headland working position with guide wheel 128 Ceus 2TX BAG0183 2 01 19...
Страница 131: ...Checklist for using the implement Ceus 2TX BAG0183 2 01 19 131...
Страница 132: ......