AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
71
Warning
The switch is heavy. Ask for assistance lifting the device out of the
shipping box. You might injure yourself or damage the device if you
lift it without assistance.
Figure 24. Lifting the Switch from the Shipping Box
2. Remove the switch from the protective shipping bag and place it on a
level, secure table. Refer to Figure 25.
Figure 25. Removing the Switch from the Protective Shipping Bag.
Содержание AT-FAN08
Страница 10: ...Figures 10...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 38: ...Chapter 1 Overview 38...
Страница 60: ...Chapter 2 Virtual Chassis Stacking 60...
Страница 80: ...Chapter 4 Installing the Chassis 80 Figure 32 Chassis Orientations in the Equipment Rack Continued...
Страница 82: ...Chapter 4 Installing the Chassis 82 Figure 34 Example of Adjusting the Equipment Rack Brackets...
Страница 104: ...Chapter 4 Installing the Chassis 104...
Страница 140: ...Chapter 5 Powering On the Chassis 140...
Страница 166: ...Chapter 7 Cabling the AT XEM2 Line Card Ports 166...
Страница 214: ...Appendix A Technical Specifications 214...