![Agilent Technologies 8890 Скачать руководство пользователя страница 95](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678095.webp)
6
Maintaining the Purged Packed Inlet
To Install a Packed Column Adapter onto a Detector
Maintaining Your GC
95
To Install a Packed Column Adapter onto a
Detector
This procedure applies to the FID, FPD+, NPD, and TCD.
1
Gather the following:
•
Packed column adapter, see
“Consumables and Parts for the Purged Packed Inlet”
•
Ferrule, Vespel/graphite, 0.8-mm id
•
7/16-inch wrench (for the packed column adapter and 1/8-inch packed column nuts)
•
9/16-inch wrench (for 1/4-inch packed column nuts)
•
1/8-inch nut and ferrule for a 1/8-inch packed column, or a 1/4-inch nut and ferrule for a
1/4-inch packed column
•
Lint-free gloves
2
Place GC in maintenance mode:
Maintenance > Instrument > Perform Maintenance >
Maintenance Mode > Start Maintenance.
Wait for the GC to become ready.
WARNING
Be careful! The oven and/or detector may be hot enough to cause burns. If the detector is
hot, wear gloves to protect your hands.
CAUTION
Wear clean, lint-free gloves to prevent contamination of parts with dirt and skin oils.
Handle the adapter carefully and install the packed column before installing the adapter into
the detector base. The thin-walled capillary tube that carries the sample into the detector can
be damaged by rough handling.
3
Place a ferrule onto the packed column adapter.
4
Carefully install the adapter assembly into the detector fitting. Align the adapter so the it
enters the detector fitting as vertically as possible. Avoid stressing the adapter capillary
tube. Finger-tighten the adapter into the detector base, then tighten an additional 1/8 turn
using a wrench.
Ferrule
Packed column adapter
Capillary tube
'HWHFWRUÀWWLQJ
Содержание 8890
Страница 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Страница 8: ...8 Maintaining Your GC ...
Страница 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Страница 28: ...3 Maintaining the GC To Change the Hydrogen Sensor Calibration Gas Cylinder 28 Maintaining Your GC ...
Страница 48: ...4 Maintaining Capillary Columns To Remove the Ferrule From a CFT Fitting 48 Maintaining Your GC ...
Страница 120: ...7 Maintaining the COC Inlet To Bakeout Contaminants from the COC Inlet 120 Maintaining Your GC ...
Страница 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Страница 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Страница 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Страница 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Страница 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Страница 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...
Страница 282: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G2790 90015 G3540 90015 ...