17 Maintaining a Valve
To Install the Upper Valve Box
Maintaining Your GC
275
To Install the Upper Valve Box
1
Gather the following:
•
T-20 Torx screwdriver
•
3-mm hex key wrench
•
Flathead screwdriver
2
Verify that all valve rotors are in the full counterclockwise position (valve
Off
).
3
For each actuator that mates with a newly installed valve:
a
Loosen the adjustment set screw.
b
Locate the rotor adjustment shaft on top of the actuator. Use a screwdriver to rotate
the valve rotor counterclockwise until it stops.
4
Locate the two half-moon cutouts at the bottom back of the upper valve box. Place the
upper valve box on top of the lower valve assembly, routing the heater/sensor wires
through the cutouts. Secure with two T-20 mounting screws.
5
Push each coupling/shaft assembly downward with a flathead screwdriver until the slot on
the coupling engages the rotor index pin.
If the coupling and valve do not engage, check that both are fully counterclockwise and
try again. If necessary, turn the shaft slightly to engage the coupling.
6
For each newly installed valve:
a
Using a flathead screwdriver, turn the rotor adjustment shaft counterclockwise until it
stops, then back it off a small amount (< 1 mm) to set one end of the rotor’s motion.
b
Tighten the adjustment set screw.
7
Install the detector cover.
8
Restore normal operating condition.
Rotor adjustment
slotted shaft
Adjustment set screw
Rotor adjustment shaft
Содержание 8890
Страница 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Страница 8: ...8 Maintaining Your GC ...
Страница 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Страница 28: ...3 Maintaining the GC To Change the Hydrogen Sensor Calibration Gas Cylinder 28 Maintaining Your GC ...
Страница 48: ...4 Maintaining Capillary Columns To Remove the Ferrule From a CFT Fitting 48 Maintaining Your GC ...
Страница 120: ...7 Maintaining the COC Inlet To Bakeout Contaminants from the COC Inlet 120 Maintaining Your GC ...
Страница 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Страница 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Страница 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Страница 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Страница 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Страница 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...
Страница 282: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G2790 90015 G3540 90015 ...