![Agilent Technologies 8890 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678011.webp)
1
About Maintaining the GC
Tools and Materials Required for Maintenance
Maintaining Your GC
11
Tools and Materials Required for Maintenance
lists the tools needed for most GC maintenance procedures. The specific tools
required to perform a maintenance procedure are listed in step 1 of each procedure.
Table 1
Tools and materials for GC maintenance
Common tools
Part number
Wrench, angled, septum nut
19251-00100
Wrench, open-end, 1/4-inch and 5/16-inch
8710-0510
*
Wrench, open-end, 9/16-inch and 7/16-inch
8710-0803
Wrench, capillary inlet
G3452-20512*
Flathead screwdriver
Column cutter, wafer, 4/pk
5181-8836*
Driver, nut, 1/4-inch
8710-1561*
T-20 Torx key or screwdriver
8710-1807
T-10 Torx key or screwdriver
8710-2140
3-mm hex key wrench
8710-2411
Electronic flow meter(s) or bubble meter(s) capable of calibrated measurements at 1, 10, and
100 mL/min flow ranges
Electronic leak detector
Magnifying loupe, 20X
430-1020
Metric ruler
Bench vise (for setting Swagelok fittings)
Razor or sharp knife
Tweezers, or
thin needle-nose pliers
8710-0007
8710-0004
Needle-nose pliers
ESD wrist strap (for installing new components)
9300-1408
Gloves, heat-resistant (for handling hot parts)
Wooden cotton swab (for removing FID filters)
Tools and materials for cleaning procedures
Cleaning brushes—The FID cleaning kit contains appropriate brushes for cleaning detectors and
inlets
9301-0985
Cleaning brushes—For cleaning split/splitless inlet split vent fitting, FID and collectors
8710-1346
Jet cleaning wire (.010-inch)
Clean, lint-free cloth (to protect contamination-sensitive detector parts)
Small ultrasonic cleaning bath with aqueous detergent (for cleaning detector and inlet parts)
Содержание 8890
Страница 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Страница 8: ...8 Maintaining Your GC ...
Страница 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Страница 28: ...3 Maintaining the GC To Change the Hydrogen Sensor Calibration Gas Cylinder 28 Maintaining Your GC ...
Страница 48: ...4 Maintaining Capillary Columns To Remove the Ferrule From a CFT Fitting 48 Maintaining Your GC ...
Страница 120: ...7 Maintaining the COC Inlet To Bakeout Contaminants from the COC Inlet 120 Maintaining Your GC ...
Страница 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Страница 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Страница 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Страница 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Страница 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Страница 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...
Страница 282: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G2790 90015 G3540 90015 ...