![Agilent Technologies 8890 Скачать руководство пользователя страница 271](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678271.webp)
17 Maintaining a Valve
To Replace a Rotary Valve in the Valve Box
Maintaining Your GC
271
To Replace a Rotary Valve in the Valve Box
WARNING
Do not install a liquid sampling valve (LSV) in the valve box if you plan to heat the box above
75 °C. Heating an LSV over 75 °C can cause a leak and subsequent explosion. LSVs should
be mounted in the side location to avoid potential explosions.
1
Gather the following:
•
“Consumables and Parts for Valves”
•
T-10 Torx screwdriver
•
1/4-inch wrench
•
Needle-nosed pliers
•
Vacuum
2
Place GC in maintenance mode:
Maintenance > Instrument > Perform Maintenance >
Maintenance Mode > Start Maintenance.
Wait for the GC to become ready.
WARNING
The oven, inlet, detector, and valve box may be very hot.
Sample and/or harmful gases may be present. Refer to your company’s standard operating
procedures for purging the chemicals from the sample line.
3
Set all valves to
Off
.
4
Leave on the GC and valve actuator air.
5
Turn off the carrier gas and sample line flows and relieve any back pressure to the valve.
WARNING
The valve box insulation is made of refractory ceramic fibers (RCFs). To avoid inhaling RCF
particles, we recommend these safety procedures:
• Ventilate your work area
• Wear long sleeves, gloves, safety glasses, and a disposable dust/mist respirator
• Dispose of insulation in a sealed plastic bag
• Vacuum any residual particles and discard
• Wash your hands with mild soap and cold water after handling RCFs.
6
Remove the upper valve box. See
“To Remove the Upper Valve Box”
Vacuum any RCF insulation particulates from the valve box area.
7
Note the tubing connections to the existing valve and label if desired.
8
Disconnect the existing valve fittings.
9
Remove the two T-10 Torx screws attaching the valve to the valve box, then remove the
valve from the valve box.
10
Place the new valve in the valve box. The gap in the index ring on top of a 6-port valve
points toward the back of the GC if installed correctly. This is the
On
position. Install and
tighten the two screws with a screwdriver.
Содержание 8890
Страница 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Страница 8: ...8 Maintaining Your GC ...
Страница 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Страница 28: ...3 Maintaining the GC To Change the Hydrogen Sensor Calibration Gas Cylinder 28 Maintaining Your GC ...
Страница 48: ...4 Maintaining Capillary Columns To Remove the Ferrule From a CFT Fitting 48 Maintaining Your GC ...
Страница 120: ...7 Maintaining the COC Inlet To Bakeout Contaminants from the COC Inlet 120 Maintaining Your GC ...
Страница 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Страница 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Страница 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Страница 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Страница 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Страница 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...
Страница 282: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G2790 90015 G3540 90015 ...