3. Run
◆
Input the information before running including the date (the default is the system date), the ambient temperature (the
default is 25
℃
and the range is 0~50
℃
) and the relative humidity (the default is 40%RH and the range is
0~100%RH).
◆
Pressure Source: Internal Pressure or Pressure Module.
◆
Automatically run the task according to setting.
◆
Record and display the trip values in the table.
◆
Press / to pause and continue the task and the mode will be changed between Standby and Control.
◆
The calibrator will automatically switch to the suitable range if needed.
◆
The calibrator can change the slew rate of the pressure control automatically according to the Setpoint and
Tolerance of the setting, also you can change the slew rate manually by press / .
3.5.6 Calibrating I/P converters
1. Connect
◆
Connect the calibrator to the I/P converter as shown
in Figure 3-24.
◆
Do not over pressure the calibrator.
◆
Check the load ability of the UUT for the internal 24V
power supply.
2. New
◆
Task name.
1) Enter an alphanumeric name, and press to input
the special codes.
Figure 3-24 Calibrating an I/P converter
45
/FLT
Содержание ADT761 Series
Страница 1: ...ADT761 Series Automated Pressure Calibrator...
Страница 14: ...7 2 1 4 Keypad Table 2 3 Key functions...