22
Mounting methods and details
Chapter 5
Installing the IED
3.3
19” panel rack mounting
3.3.1
19” panel mounting details
Figure 9:
Panel mounting details. The flanges are interchangeable.
3.3.2
Mounting procedure for 19” panel mounting
Procedure
1.
Carefully fasten the mounting angles to the sides of the IED.
Use the screws supplied in the mounting kit.
2.
Place the IED assembly in the panel.
3.
Fasten the mounting angles with appropriate screws.
PosNo
Description
1a, 1b
Two rack flanges, which can be mounted, either to the left or right side of the case.
2
Eight fastening screws.
xx04000452.vsd
1a
2
1b
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...