86
Distance protection
Chapter 11
Verifying settings by secondary
injection
5.1.1
Measuring the operate limit of set values in cases without shaped load
encroachment characteristics (OperationLdCmp=off)
Procedure for phase to phase fault L1–L2.
1.
Subject the IED to healthy normal load conditions for at least two
seconds.
2.
Apply the fault condition and slowly decrease the measured imped-
ance to find the operating value of the phase-to-phase loop for zone
1 according to test point 1 in
figure 26
and
table 15
. Compare the re-
sult of the measurement with the set value.
3.
Repeat
steps 1
to
to find the operating value for test point P2, P3 in
table
table 15
and the operating value for the phase-to-earth loop ac-
cording to test point P1, P2, P3 in table
.
Observe that the zone that is not tested has to be blocked and the zone that
is tested has to be released.
The procedure for phase to earth faults in L3 is the same as that described
for phase to phase faults except that
figure 27
table 16
should be re-
ferred to.
5.1.2
Measuring the operate time of distance protection zones
Procedure
1.
Subject the IED to healthy normal load conditions for at least two
seconds.
11
X
0.27 x (2 x X1
set
+X0
set
)
Exact: 0.8 x (2 x X1
set
+ X0
set
)/3
R
–0.57 x (2 x X1
set
+ X0
set
)
Exact: 0.8 x (2X1
set
+ X0
set
)/(3 x tan(AngNegDir
90))
12
X
0.5 x (2 x X1
set
+ X0
set
)/3
R
0.5 x (2 x R1
set
+ R0
set
)/3
13
X
0
R
RFPE
Test point
Reach
Value
Comments
Note!
Test points 8 and 9 are intended to test the directional lines of impedance protection. Since di-
rectionality is a common function for all 5 measuring zones, it is only necessary to test points 6,
7, 8 and 9 once, in the forward direction (the largest reverse zone can be used to facilitate the
test) in order to test the accuracy of directionality (directional angles). Directional functionality
testing (trip inside, no-trip outside) should always be carried for all ZM zones set with direction-
ality (forward or reverse).
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...