164
Metering
Chapter 11
Verifying settings by secondary
injection
15
Metering
15.1
Pulse counter logic (GGIO)
The test of the pulse counter function requires the Parameter Setting Tool in the PCM or an ap-
propriate connection to a local HMI with the necessary functionality. A known number of pulses
with different frequencies are connected to the pulse counter input. The test should be performed
with settings
Operation = Off/On
and the function blocked/deblocked. The pulse counter value
is then recorded by the PCM or local HMI.
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...