Making the electrical connection
Chapter 5
Installing the IED
The cubicle must be properly connected to the station earthing system. Use a conductor with a
core cross section area of at least 4 mm
2
(AWG 12).
Figure 18:
Rear view of IED with one TRM showing earthing points.
4.5
Making the screen connection
When using screened cables always make sure screens are earthed and connected according to
applicable engineering methods. This may include checking for appropriate earthing points near
the IED, for instance, in the cubicle and/or near the source of measuring. Ensure that earth con-
nections are made with short (max. 10 cm) conductors of an adequate cross section, at least 6
mm
2
(AWG10) for single screen connections.
where:
1
is main protective earth to chassis
2
is earthing screw to Power Supply Module
3
is earthing screw to TRM. (There is one earth connection per TRM)
2
1
3
en05000509.vsd
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...