84
Distance protection
Chapter 11
Verifying settings by secondary
injection
Figure 27:
Distance protection (ZM) characteristic with test points for phase to earth mea-
surements
Table 16
is used in conjunction with
figure 27
.
Table 15:
Test points for phase-to-phase loops L1-L2 (Ohm/Loop)
X1+XN
R
X
(
Ω
/ loop)
50%
80%
1
2
3
4
5
6
7
8
9
10
11
80% of RLdFw
40% of RLdFw
RFPE
12
en05000369.vsd
13
a
c
b
alt. 80% of
RFPE (Load
encroachment)
Test point
Reach
Set value
Comments
1
X
X1
set
R
0
2
X
X1
set
R
R1
set
3
X
0.8 x X1
set
R
0.8 x R1
set
+ RFPP/2
4
X
0.5 x X1
set
R
0.5 x R1
set
+ RFPP/2
5
X
0.85 x RFPP x tan (ArgRLd)
ArgRLd
= angle for the maximal load transfer
R
0.85 x RFPP
6
X
RLdFw x tan (ArgLd)
R
RLdFw
7
X
RLdFw x tan (ArgLd)
R
0
8
X
–0.2143 x RFPP/2
Exact: 0.8 x RFPP/2 (ArgDir)
R
0.8 x RFPP/2
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...