Refitting the motor
Use these procedures to refit the axis-2 motor.
Refitting the cooling pad
Note
Action
For robots with protection type Clean Room:
1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Cooling pad for axis-1 and -2 mo-
tors: 3HAC071020-001
Attach the cooling pad together with the bracket
to the motor.
2
Make sure the bracket does not exceed the motor
flange and the screw holes are aligned.
Screw: M3x5 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Refit the cooling pad bracket.
3
Tightening torque: 1.2 Nm
xx1800003026
Refitting the axis-2 motor
Note
Action
For robots with protection type Clean Room:
1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Check that:
•
all assembly surfaces are clean and without
damages
•
the motor is clean and undamaged.
2
Continues on next page
516
Product manual - IRB 1100
3HAC064992-001 Revision: L
© Copyright 2019-2022 ABB. All rights reserved.
5 Repair
5.7.2 Replacing the axis-2 motor
Continued
Содержание IRB 1100
Страница 1: ...ROBOTICS Product manual IRB 1100 ...
Страница 2: ...Trace back information Workspace 22C version a10 Checked in 2022 09 29 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 38: ...This page is intentionally left blank ...
Страница 50: ...This page is intentionally left blank ...
Страница 738: ...This page is intentionally left blank ...
Страница 760: ...This page is intentionally left blank ...
Страница 764: ......
Страница 765: ......