129
Maintenance intervals
Total worked hours
Items to check
10
50 100 200 400 800
Electrolyte level check and replace
●
Battery
Charge check and electrolyte
density check
●
Oil level check and replace
●
Oil replace
●
Travel engine
Bolts and hydraulic connections
fastening
●
Crawler
Tension check
●
Sprocket bolts fastening
U
●
Sprocket and
roller idler
Oil level check and replace
●
Lubrication
Grease fitting lubrication
●
Controls check
●
Levers check
●
Throttle lever check
●
Controls and
levers
Pedal check
●
●
Ordinary maintenance operation.
U
First maintenance in breaking-in period.
18.3 MAINTENANCE DURING BREAKING-IN PERIOD
Breaking-in period is 100 hours long as recommended; meanwhile you must
pay attention to avoid over forcing the engine, working equipment and travel
engine, to keep machine life and reliability as long.
Start working only when the engine has reached the correct temperature and
hydraulic oil is up to 20 °C.
Do all maintenance operations with care during breaking-in period, in the
intervals scheduled above and noted with
U
.
Summary of Contents for YC135
Page 2: ......
Page 4: ...4...
Page 14: ...14...
Page 40: ...40...
Page 51: ...51 5 2 1 Transport blocked All dimensions are in mm they may change without notice...
Page 95: ...95...
Page 100: ...100...
Page 108: ...108...
Page 110: ...110...
Page 118: ...118...
Page 120: ...120...
Page 124: ...124...
Page 169: ...169 20 HYDRAULIC SCHEME...
Page 171: ...171 21 ELECTRICAL SCHEME...
Page 179: ...179 24 NOTICE...
Page 180: ...180...