105
12. TRANSPORTATION
12.1 LOADING UNLOADING WORK
M
ACHINE LOAD
/
UNLOAD
Load and unload the machine is a dangerous operation so
be particularly careful.
M
ACHINE LOAD
/
UNLOAD
•
Make sure the ramp has sufficient width, length and
thickness to enable the machine to be safely loaded and
unloaded. If ramps sag appreciably reinforce them with
blocks.
•
When loading or unloading the machine, run the engine
at the idling speed then travel slowly.
•
When loading or unloading the machine, park the trailer
on a flat, firm roadbed. Keep a fairly long distance
between the road shoulder and the machine.
•
Remove the mud from the under carriage to prevent the
machine from slipping to the side on slopes.
•
Never change the direction of travel when on the ramps. If
it is necessary drive off the ramps and correct the
direction, then drive on to the ramps again.
•
When turning the machine on trailer, the machine’s
footing is unstable, so carry out the operation slowly.
•
Ever check if the cabin door is locked (open or closed).
Never open or close the door when travel on ramps it may
cause a sudden stability change.
Summary of Contents for YC135
Page 2: ......
Page 4: ...4...
Page 14: ...14...
Page 40: ...40...
Page 51: ...51 5 2 1 Transport blocked All dimensions are in mm they may change without notice...
Page 95: ...95...
Page 100: ...100...
Page 108: ...108...
Page 110: ...110...
Page 118: ...118...
Page 120: ...120...
Page 124: ...124...
Page 169: ...169 20 HYDRAULIC SCHEME...
Page 171: ...171 21 ELECTRICAL SCHEME...
Page 179: ...179 24 NOTICE...
Page 180: ...180...