
<4. Piping>
4-2
IM 11M13A01-04E
3rd Edition : Dec.15,2014-00
4.1 Piping for System 1
The piping in System 1 is illustrated in Figure 4.1
~
ZR202S Integrated type Explosion-proof
Zirconia Oxygen Analyzer
F4-1E.ai
ZA8F
Flow Setting Unit
Reference gas
Calibration gas
Needle
valve
Flowmeter
Instrument air
Air Set
Pressure
reducing
valve
Zero gas
cylinder
Stop valve
or
Check valve
Span gas
Hazardous Area
Non-hazardous Area
Calibration gas
unit case
100 to 240 V AC
Contact input
Analog output, contact output
Digital output (HART)
Figure 4.1
Piping for System 1
Piping in System 1 is as follows:
• Mount the check valve or the stop valve through a nipple to the calibration gas inlet of the
equipment.
4.1.1 Piping Parts for System 1
Referring to Table 4.1, check that the parts required for your system are ready.
Table 4.1
Piping Parts
Equipment
Piping location
Parts Name
Description
Integrated type
Explosion-proof
Zirconia
Oxygen Analyzer
Calibration gas inlet Stop valve or check valve Stop valve (L9852CB or G7016XH)
recommended by YOKOGAWA
Check valve (K9292DN or K9292DS)
provided by YOKOGAWA
Nipple *
R1/4 or 1/4 NPT
General parts
Zero gas cylinder
User’s scope
Pressure reducing valve
(G7013XF or G7014XF) recommended by
YOKOGAWA
Joint for tube connection * R1/4 or 1/4 NPT
General parts
Reference gas inlet Air set
(G7003XF/ K9473XK or G7004XF/ K9473XG)
recommended by YOKOGAWA
Joint for tube connection * R1/4 or 1/4 NPT
General parts
Note: Parts with marking * are used when required. General parts can be found on the local market.
Summary of Contents for ZR202S
Page 12: ...xi IM 11M13A01 04E Introduction ...
Page 18: ...Blank Page ...
Page 61: ...Blank Page ...
Page 129: ...Blank Page ...
Page 141: ...Blank Page ...
Page 153: ......
Page 155: ......
Page 157: ......
Page 159: ...Blank Page ...
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......