
<4. Piping>
4-1
IM 11M13A01-04E
3rd Edition : Dec.15,2014-00
4. Piping
This chapter describes piping procedures in the two typical system configurations for EXAxt ZR
Integrated type Explosion-proof Zirconia Oxygen Analyzer.
• Ensure that each check valve, stop valve and joints used for piping are not leaking.
Especially, if there is any leakage at piping and joints for the calibration gas, it may cause
clogging of the piping or incorrect calibration.
• Be sure to conduct leakage test after setting the piping.
• Basically, apply instrument air (dehumidified by cooling to the dew point -20°C or lower, and
removing any dust, oil mist and the like) for the reference gas.
CAUTION
Do not loosen or remove any Flame Arrestor of gas inlet/outlet during piping.
The detector modification or parts replacement by other than authorized representative of Yokogawa
Electric Corporation is prohibited and will void ATEX Certification, FM Approval, CSA Certification and
IECEx Certification.
Flame Arrestor
F4-0E.ai
Summary of Contents for ZR202S
Page 12: ...xi IM 11M13A01 04E Introduction ...
Page 18: ...Blank Page ...
Page 61: ...Blank Page ...
Page 129: ...Blank Page ...
Page 141: ...Blank Page ...
Page 153: ......
Page 155: ......
Page 157: ......
Page 159: ...Blank Page ...
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......