
<3. Installation>
3-9
IM 11M13A01-04E
3.2.2 Mounting of ZA8F Flow Setting Unit
The flow setting unit can be mounted either on a pipe (nominal JIS 50A) or on a wall. It should be
positioned vertically so that the flowmeter works correctly.
<Pipe Mounting>
(1) Prepare a vertical pipe of sufficient strength (nominal JIS 50A: O.D. 60.5 mm) for mounting the
flow setting unit. (The unit weighs approximately 2 to 3.5 kg.)
(2) Mount the flow setting unit on the pipe by tightening the nuts with the U-bolt so that the metal
fitting is firmly attached to the pipe.
F3.5E.ai
Figure 3.7
Pipe Mounting
<Wall Mounting>
(1) Make a hole in the wall as illustrated in Figure 3.8.
223
140
F3-6E.ai
4 - Ø6 hole, or M5 screw
Unit: mm
Figure 3.8
Mounting holes
(2) Mount the flow setting unit. Remove the pipe mounting parts from the mount fittings of the flow
setting unit and attach the unit securely on the wall with four screws.
F3-7E.ai
Figure 3.9
Wall mounting
Summary of Contents for ZR202S
Page 12: ...xi IM 11M13A01 04E Introduction ...
Page 18: ...Blank Page ...
Page 61: ...Blank Page ...
Page 129: ...Blank Page ...
Page 141: ...Blank Page ...
Page 153: ......
Page 155: ......
Page 157: ......
Page 159: ...Blank Page ...
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......