![YOKOGAWA CENTUM CS Technical Information Download Page 54](http://html1.mh-extra.com/html/yokogawa/centum-cs/centum-cs_technical-information_910927054.webp)
2. Transportation, Storage and Installation
2-10
TI 33J01J10-01EN
2.5 Installation
Before installation, be sure that anchor bolts, pedestals, and cable holes are provided
according to the customer’s system configuration plans. Check that the positions of
holes on the floor fit the anchor bolt holes in the channel base of each piece of equipment.
2.5.1
Installation on Floor
The installation method varies with the type of the floor and building.
• After unpacked, be careful not to put any impact until it is fixed to the floor to prevent from
tip-over.
• Install devices as specified in the plans.
Check the position of front and back panels of the cabinet.
Avoid physical shock. Never use hammers.
• Fix each equipment to the floor. The explanation below shows how to fix devices on different
types of floors.
n
Concrete Floor
Clamp the equipment to the floor using anchor bolts. It is recommended to use M12 bolts and
3,200 N•cm tightening torque.
Equipment
Anchor bolts
F020501.ai
Figure Using Anchor Bolts
Apr. 21, 2017-00
Summary of Contents for CENTUM CS
Page 2: ...Blank Page...
Page 246: ...Blank Page...