4. Installation Specifications
4-2
TI 33J01J10-01EN
Equipment
Input-voltage range
Max. power
consumption
(VA, A) (*1)
Heating
value J/h
(*2)
Voltage (V AC) Frequency (Hz)
ANB11D Node Unit for Dual-Redundant ESB Bus
with Optical Repeater
(at maximum installation of FIO)
100-120
50/60±3
200 VA
432 x 10
3
(120 W)
220-240
230 VA
24 V DC
5.5 A
ANT10U Unit for Optical ESB Bus Repeater Module
(at maximum installation of FIO)
100-120
50/60±3
200 VA
432 x 10
3
(120 W)
220-240
230 VA
24 V DC
5.5 A
ACB51 I/O Expansion Cabinet
(at maximum installation of FIO)
100-120
50/60±3
2500 VA
5400 × 10
3
(1500 W)
220-240
2860 VA
24 V DC
71 A
AVR10D Duplexed Vnet Router
100-120
50/60±3
80 VA
158 × 10
3
(44 W)
220-240
110 VA
24 V DC
1.7 A
ACUKT1 Cabinet Utility Kit
(at maximum installation of FIO)
100-120
50/60±3
2900 VA
6264 × 10
3
(1740 W)
220-240
3320 VA
24 V DC
82 A
ACUKT1 Cabinet Utility Kit
(excluding node)
100-120
50/60±3
100 VA
216 × 10
3
(60 W)
220-240
100 VA
24 V DC
5 A
AW810D Wide Area Communication Router
100-120
50/60±3
80 VA
158 × 10
3
(44 W)
220-240
110 VA
24 V DC
1.7 A
A2NN10D Node Interface Unit
100-240
50/60±3
VA
98 × 10
3
(27 W)
24 V DC
W
A2NN30D Node Interface Unit
100-240
50/60±3
190 VA
98 × 10
3
(27 W)
24 V DC
150 W
A2PW503 Power Supply Unit
100-240
50/60±3
165 VA
54 × 10
3
(15 W)
A2PW504 Power Supply Unit
24 V DC
150 W
A2BN3D Base Plate for Adaptor
24 V DC
8 A
51 × 10
3
(14 W)
A2BN4D Base Plate for Barrier (MTL) System Power
24 V DC
24 W
51 × 10
3
(14 W)
A2BN4D Base Plate for Barrier (MTL) Barrier Power
24 V DC
38.4 W
83 × 10
3
(23 W)
A2BN5D Base Plate for Barrier (P+F) System Power
24 V DC
24 W
51 × 10
3
(14 W)
A2BN5D Base Plate for Barrier (P+F) Barrier Power
24 V DC
28.8 W
58 × 10
3
(16 W)
*1:
Power consumption in steady operation is indicated in VA (AC), A (DC) or W (DC). When power consumption varies according to
the installed number of equipment, power consumption by the maximum number of units installed is listed.
*2:
Heating value in steady operation is indicated in Joule/hour. When heating value varies according to the installed number of
equipment, heating value by the maximum number of units installed is listed.
June 30, 2016-00
Table Electrical Specifications (2/2)
Summary of Contents for CENTUM CS
Page 2: ...Blank Page...
Page 246: ...Blank Page...