TILLER HANDLE ASSEMBLY
7-3
E
BRKT
DISASSEMBLING/ASSEMBLING THE TILLER HANDLE ASSEMBLY
1
2
3
4
5
6
7
8
9
6
16 mm
6
40 mm
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
34
572
572
6
26 mm
8
40 mm
37 Nm(3.7 m kgf, 27 ft lb)
12
80 mm
6
14 mm
6
14 mm
6
30 mm
6
14 mm
572
6
24 mm
6
20 mm
Order
Job/Part
Q’ty
Remarks
1
Screw
5
2
Screw
2
3
Cover
1
4
Nut
1
5
Engine stop switch
1
6
Main switch assembly
1
(WHD)
7
Bolt
1
8
Clamp
1
For shift cable
9
Bolt
1
10
Clamp
1
For throttle cable
11
Circlip
2
12
Shift cable
1
Long
13
Throttle cable
1
Short
Continued on next page.
Summary of Contents for F40BED
Page 126: ...GENERAL 3 25 E CHK ADJ LUBRICATION POINTS Apply Water resistant grease ...
Page 128: ...CHK ADJ 3 26 GENERAL E ...
Page 129: ...3 26 CHK ADJ F D ES ...
Page 528: ......
Page 529: ......
Page 536: ......
Page 537: ...Printed on recycled paper Printed in Japan Sep 1999 1 7 1 F40B YAMAHA MOTOR CO LTD ...