MNC-0600-012
3 of 6
Revision C
Preventive Maintenance, ODU SSPA
Preventive Maintenance, ODU SSPA
Requirements
Monthly
Inspect the Air Inlet and Exhaust Ports. Ensure the ports are
unobstructed. Remove any:
•
Lint
•
Leaves
•
Straw
Quarterly
Inspect and clean:
•
The electrical connections; make sure all connections are
clean and tight.
•
The Fin Assembly including main cooling fins and power
supply fins.
Maintenance Procedures
Fin Assembly
Perform the following procedure to remove, inspect, and clean
the cooling Fin Assembly.
1 Turn the Power Amplifier OFF.
2. Disconnect the Prime Power.
3. Remove power supply leaving the main electrical conector in
place. Refer to the appendix titled
SSPA Power Supply
Removal Procedure
.
4. Using high pressure air blow the any accumulated dirt and
debris out of the exposed fin assembly.
5. Check the integrity of the electrical connections.
To replace the SSPA Power Supply refer to the appendix titled
SSPA Power Supply Removal Procedure
.
Summary of Contents for XTS-200C
Page 10: ...MNC 0000 010 2 Revision A6...
Page 38: ...MNC 0200 004 14 of 14 Revision C Safety Sicherheit...
Page 64: ...MNC 0300 011 26 of 26 Revision H Unpacking and Installation...
Page 72: ...Operation MNC 0400 012 8 of 8 Revision C...
Page 104: ...MNC 0500 010 32 Revision D Solid State Power Amplifier Communication and Protocol...
Page 122: ...MNC 0700 001 6 Revision F Service and Repair...
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 144: ...MNC 0000 039 4 of 12 Revision 2 ODU SSPA Power Supply Removal...
Page 152: ...MNC 0000 039 12 of 12 Revision 2 ODU SSPA Power Supply Removal...
Page 155: ...MNC 0000 003 3 of 4 Revision B Operation Addendum SSPA M C Termination Cable...
Page 156: ...MNC 0000 003 4 of 4 Revision B Operation Addendum SSPA M C Termination Cable...
Page 160: ...MNC 0000 002 4 Revision A Protocol Adendum Block Upconverter...