Initial commissioning
4 - 1
ba43134e08
05/2017
4
Initial commissioning
4.1
Checklist for initial commissioning
Is the waste water connection installed?
Is the outlet of the tray connected?
Is the sample feed connected?
Is the electrical connection according to regulations?
Are the (optional) peripheral devices (relay connections, recorder,
etc.) connected?
Note
Please read section 5.1 B
before you start the following steps for the initial commissioning.
4.2
Switching on
Switching on the
TresCon UNO
Fig. 4-1
Power switch
1
Start the preparatory activities according to the checklist.
2
Open the enclosure door.
3
Use the mains switch to switch on the TresCon UNO
(position I). The analyzer module is heated to the temperature
that was set.
O
I
power switch
O
I
TresCon
Pumpschlauch Standard/Probe
blau / blau / blau
Pumpschlauch Reagenz
orange / gelb / orange
Pump Tube Standard/Sample
blue / blue / blue
Pump Tube Reagent
orange / yellow / orange
TresCon PO4-P
Reinigungslösung
Cleaning Solution
H O dest.
H O dest.
2
2
Standard B
Standard B
Reagenz
Reagent
Ablauf
blau
blue
V3
V2
V4
Thermoblock
Probe
Sample
V1
gelb
yellow
orange
orange
grün
green
blau
blue
rot
red
grün
green
P1
P2
P3
TresCon P04-P
Ser.-Nr. 00110010
WTW 82362 Weilheim Made in Germany
Summary of Contents for TresCon UNO A111
Page 6: ...Inhaltsverzeichnis TresCon UNO 0 4 ba43134e08 05 2017 9 1 Abbreviations 9 1 9 2 Index 9 1...
Page 18: ...Safety TresCon UNO 2 4 ba43134e08 05 2017...
Page 56: ...Initial commissioning TresCon UNO 4 4 ba43134e08 05 2017...
Page 133: ...TresCon UNO Operation 5 77 ba43134e08 05 2017 9 Select Yes or No with 68 and confirm with 3...
Page 167: ...TresCon UNO Maintenance 6 11 ba43134e08 05 2017 6 Leave the menu with 4...
Page 202: ...Appendix TresCon UNO 8 24 ba43134e08 05 2017...
Page 207: ......