![wtw TresCon UNO A111 Operating Manual Download Page 33](http://html1.mh-extra.com/html/wtw/trescon-uno-a111/trescon-uno-a111_operating-manual_1000694033.webp)
TresCon UNO
Installation
3 - 15
ba43134e08
05/2017
Switching voltages and switching currents on the relay contacts
must not exceed the values specified in chapter 7 T
.
Protect electrical circuits against currents that are too high with an
electrical fuse.
The mounting frame may only be opened after the installation if all
external voltages have been previously switched off.
The analyzer has programmable control, indicator and alarm contacts.
Warning
If the load at an indicator contact is inductive, an RCD protective circuit
is required! For an example of the circuit, see Fig. 3-14.
Summary of Contents for TresCon UNO A111
Page 6: ...Inhaltsverzeichnis TresCon UNO 0 4 ba43134e08 05 2017 9 1 Abbreviations 9 1 9 2 Index 9 1...
Page 18: ...Safety TresCon UNO 2 4 ba43134e08 05 2017...
Page 56: ...Initial commissioning TresCon UNO 4 4 ba43134e08 05 2017...
Page 133: ...TresCon UNO Operation 5 77 ba43134e08 05 2017 9 Select Yes or No with 68 and confirm with 3...
Page 167: ...TresCon UNO Maintenance 6 11 ba43134e08 05 2017 6 Leave the menu with 4...
Page 202: ...Appendix TresCon UNO 8 24 ba43134e08 05 2017...
Page 207: ......