5. If the brakes did not function, check the voltage of the breakaway battery. To do
so:
a. Remove the cover of the battery box.
b. Remove the wires connected to the breakaway battery
(d)
.
c. Measure the voltage. If 12–14 VDC is not measured, replace or recharge the
breakaway battery.
6. If 12–14 VDC was measured but the brakes did not function, there is a wiring or
mechanical fault with the brakes. Repair any faults before towing.
7. If the brakes function properly:
a. Reconnect the wires to the breakaway battery.
b. Reinstall the cover to the battery box.
a. Reinstall the breakaway pin
(b)
into the brake switch.
b. Connect the trailer wiring plug to the tow vehicle.
Result
The procedure to test the breakaway system is now complete.
wc_gr008472
d
VDC
1000
200
20
2
200m
F
V
A
V-
COM
Summary of Contents for 5000620172
Page 19: ...E 1100 Safety Information wc_si000628gb fm 19 Notes ...
Page 20: ...Labels E 1100 20 wc_si000629gb fm 2 Labels 2 1 Label Locations wc_gr009588 ...
Page 105: ...ghi_tx001153gb fm 105 E 1100 Maintenance ...
Page 122: ...Technical Data E 1100 122 wc_td000476gb fm 10 5 Dimensions cm in wc_gr008706 ...
Page 133: ...wc_tx001673gb fm 133 Fuji Temperature Controller ...
Page 134: ...wc_tx001673gb fm 134 Fuji Temperature Controller ...
Page 151: ...E 1100 Schematics wc_tx001908gb fm 151 11 3 Burner System Circuit ...
Page 152: ...Schematics E 1100 152 wc_tx001908gb fm 11 4 Circulation System Circuit ghi_gr005662 ...
Page 153: ...E 1100 Schematics wc_tx001908gb fm 153 11 5 Rewind System Circuit ...
Page 158: ...Schematics E 1100 158 wc_tx001908gb fm 11 10 Genset DC Wiring Diagram ...
Page 160: ......
Page 161: ......