Table of Contents
E 1100
wc_bo5200003474_02TOC.fm
6
4.14
Connecting Power to the Machine ...................................................... 50
4.15
Powering Up the Machine ................................................................... 51
4.16
Preheating the HTF ............................................................................ 52
4.17
Initiating the HTF Flow ........................................................................ 53
4.18
Unwinding and Positioning the Hoses ................................................ 54
4.19
Hose Spacing Guidelines ................................................................... 55
4.20
Monitoring the Operating Parameters ................................................. 56
4.21
Rewinding the Hoses .......................................................................... 57
4.22
Shutting Down and Packing Up the Machine ..................................... 59
4.23
Quick-Connect Coupling Usage and Care .......................................... 60
4.24
Resetting a Low HTF Fault ................................................................. 61
4.25
Operating States of the Beckett Burner Controller ............................. 63
4.26
Operating at High Elevations .............................................................. 67
5
Accessories
68
5.1
Accessories ........................................................................................ 68
5.2
Expanding the Surface Heating Capacity ........................................... 69
5.3
Expanded Operation using One SPP and One HHS 1101 ................. 71
5.4
Expanded Operation using One DPP and One HHS 2202 ................. 72
5.5
Using Heat Exchangers (to Heat Air) .................................................. 73
5.6
Connecting a HX 100 Heat Exchanger ............................................... 74
5.7
Connecting two HX 50 Heat Exchangers ........................................... 76
6
Burner Setup
78
6.1
Setting/Checking the Electrodes ......................................................... 81
6.2
Checking/Replacing the Burner Nozzle .............................................. 83
6.3
Setting the “Z” Distance ...................................................................... 85
6.4
Adjusting the Air Settings .................................................................... 86
6.5
Setting the Fuel Pressure ................................................................... 87
6.6
Removing the Burner .......................................................................... 88
6.7
Installing the Burner ............................................................................ 89
7
Maintenance
90
7.1
Preparing for Maintenance ................................................................. 90
7.2
Periodic Maintenance Schedule ......................................................... 90
7.3
Cleaning the Machine ......................................................................... 91
7.4
Inspecting the Machine ....................................................................... 92
7.5
Inspecting the HTF System and the Fuel System .............................. 92
Summary of Contents for 5000620172
Page 19: ...E 1100 Safety Information wc_si000628gb fm 19 Notes ...
Page 20: ...Labels E 1100 20 wc_si000629gb fm 2 Labels 2 1 Label Locations wc_gr009588 ...
Page 105: ...ghi_tx001153gb fm 105 E 1100 Maintenance ...
Page 122: ...Technical Data E 1100 122 wc_td000476gb fm 10 5 Dimensions cm in wc_gr008706 ...
Page 133: ...wc_tx001673gb fm 133 Fuji Temperature Controller ...
Page 134: ...wc_tx001673gb fm 134 Fuji Temperature Controller ...
Page 151: ...E 1100 Schematics wc_tx001908gb fm 151 11 3 Burner System Circuit ...
Page 152: ...Schematics E 1100 152 wc_tx001908gb fm 11 4 Circulation System Circuit ghi_gr005662 ...
Page 153: ...E 1100 Schematics wc_tx001908gb fm 153 11 5 Rewind System Circuit ...
Page 158: ...Schematics E 1100 158 wc_tx001908gb fm 11 10 Genset DC Wiring Diagram ...
Page 160: ......
Page 161: ......