7.13
Preparing the Machine for Seasonal Operation
Background
After removing the machine from long-term storage, it must be prepared for
operation. Perform the procedures below before each seasonal use.
Before
powering up
machine
Perform the procedures below before you power up the machine.
With machine
powered up
Perform the procedures below with the machine powered up.
Item
Task
Machine exterior
Clean all outside surfaces
Heater and burner
Remove protective coverings from chimney and
burner.
Remove any carbon buildup from the heater
and burner assemblies.
Replace the burner nozzle or orifice.
Verify burner electrode position.
Controls and wiring
Inspect all wires for damage, corrosion, or wear.
Replace damaged wiring.
Inspect all electrical components for damage,
corrosion, or wear. Replace damaged electrical
components.
Fuel system
Replace the fuel filter element if applicable.
Check gas train for leaks if applicable.
Item
Task
Burner
Verify fuel pump pressure if applicable.
Verify gas pressure if applicable.
Verify burner combustion.
Summary of Contents for 5000620172
Page 19: ...E 1100 Safety Information wc_si000628gb fm 19 Notes ...
Page 20: ...Labels E 1100 20 wc_si000629gb fm 2 Labels 2 1 Label Locations wc_gr009588 ...
Page 105: ...ghi_tx001153gb fm 105 E 1100 Maintenance ...
Page 122: ...Technical Data E 1100 122 wc_td000476gb fm 10 5 Dimensions cm in wc_gr008706 ...
Page 133: ...wc_tx001673gb fm 133 Fuji Temperature Controller ...
Page 134: ...wc_tx001673gb fm 134 Fuji Temperature Controller ...
Page 151: ...E 1100 Schematics wc_tx001908gb fm 151 11 3 Burner System Circuit ...
Page 152: ...Schematics E 1100 152 wc_tx001908gb fm 11 4 Circulation System Circuit ghi_gr005662 ...
Page 153: ...E 1100 Schematics wc_tx001908gb fm 153 11 5 Rewind System Circuit ...
Page 158: ...Schematics E 1100 158 wc_tx001908gb fm 11 10 Genset DC Wiring Diagram ...
Page 160: ......
Page 161: ......