Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
2.3.1
Removing
Prerequisite
• Engine removed
Caution
When doing any repair work, especially in the engine compart‐
ment, pay attention to the following due to the cramped condi‐
tions:
♦ Route all the various lines (e.g. for fuel, hydraulics, acti‐
vated charcoal filter system, coolant, refrigerant, brake
fluid and vacuum) and electrical wiring in their original po‐
sitions.
♦ Ensure that there is sufficient clearance to all moving or
hot components.
– All cable ties which are opened or cut open when engine is
removed must be replaced in the same position when engine
is installed.
– Remove intake manifold and cylinder head cover
⇒ page 68
.
– Set crankshaft to TDC No. 1 cylinder marks -arrow- by turning
crankshaft on the vibration damper securing bolt in direction
of engine rotation:
– It must now be possible to insert camshaft bar - T10068 A- in
groove in both shafts.
Phaeton 2003 ➤
6-cylinder injection engine - Edition 02.2014
2. Valve gear
83