4.7.4.7
Checking the front loader frame bolt tightness
Check the front loader frame bolt tightness periodically.
IMPORTANT: The front loader frame bolt tightness must be checked every 50
hours if the front loader is used continuously with heavy loads.
1. Open the battery casing.
2. Detach the engine electric centre from the battery casing.
1
3
2
2
GUID-FCB64313-E981-403D-8220-76261F7B12F8
1. Engine electric centre fastening clip
2. Battery casing fastening screw
3. Main electric centre fastening screw
Leave the electric centre hanging by its harness.
3. Detach the main electric centre from the battery casing.
Unscrew the main electric centre fastening screws. Leave the electric centre
hanging by its harness.
4. Unscrew the battery casing fastening screws.
There are three fastening screws.
4. Maintenance
- 378 -
Summary of Contents for Versu N Series
Page 1: ...OPERATOR SMANUAL NSERIES Versu Ref no 39 893 21 3 08 2015 YOUR WORKING MACHINE...
Page 2: ......
Page 517: ......