The D-90 hot melt unit is assembled at the factory. However, the power and
the glue hoses must be connected by the customer. This section contains
instructions for making the necessary connections.
While choosing a location for the unit, keep in mind that:
•
Service personnel will need access to the front and sides of the
unit for electrical service.
See Section 9 - Specifications, for the
working profile.
•
The operator needs easy access to the front of the unit.
•
If using casters, make sure the locks in the casters are engaged.
•
The unit should have clearance around the outside of the case to
allow air to circulate freely around it.
•
The location should be near the glue station so that the glue
hoses can be routed to the applicators in as straight a line as
possible.
•
The location for the unit should be clean. Contaminants in the
adhesive causes clogging of the applicator nozzles.
•
The unit should be protected from high and low ambient
temperatures (<-10
o
C and >50
o
C), as well as from rapid changes
in ambient temperature.
•
The unit must be protected from condensate and water.
•
The unit must be protected from strong vibrations.
•
Avoid areas with drafts. If this is not possible, the guns will need
protection, as if the temperature falls rapidly, they may not
operate properly.
Choosing a
Location
Transport
The equipment is supplied on a pallet.
Approximate dimensions:
Approximate dimensions:
Approximate dimensions:
Approximate dimensions:
Approximate dimensions: 53”H x 30”W x 41”D
Approximate weight:
Approximate weight:
Approximate weight:
Approximate weight:
Approximate weight: 1050 lbs. (maximum weight for the D-90 with all of the
options installed, coupled with the weight of the crate)
Remove the top and front covers to unpack.
CAUTION!
CAUTION!
CAUTION!
CAUTION!
CAUTION!
Unpack carefully to prevent damage to the machine.
Inspect the equipment for damage caused during
transport.
The unit may be shipped with the cable track
disconnected. The track must be reconnected prior to
operation.
Summary of Contents for D-90
Page 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Page 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Page 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Page 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Page 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Page 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...