5-26
Valco Cincinnati, Inc.
Section 5 – Setup
MM125 - D-90 Hot Melt Unit
Shift Times/Setback
Times
Three shifts can be programmed into the unit. Start shift, end shift, and
setback times can be pre-programmed for each shift to reduce downtime.
Make certain all desired temperatures are set first (see Programming
Temperatures, this section).
First program the time the heaters will be on, off, and in setback for each of
the three shifts. Use the Right/Left Arrow Buttons to move through the times
and shifts and the OK Button to get a thumbwheel to set the times and turn on
the setback feature with a “switch” on the thumbwheel. (The heaters can be
set with or without using the setback times.)
Set the start, stop, and setback times for all shifts. Leave the unused shifts/
times blank (— —).
Programming Shifts
This screen states that for Shift A, heaters will turn on at 7:00 AM to the
setpoint temperatures (set on the Temperature Screens, previously shown)
and off at 3:00 PM, with all heaters going to the setback temperatures from
11:30 AM to 12:00 PM.
Summary of Contents for D-90
Page 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Page 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Page 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Page 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Page 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Page 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...