5-27
Valco Cincinnati, Inc.
Section 5 – Setup
MM125 - D-90 Hot Melt Unit
This screen states that for Shift C, nothing will be on, since there is no Shift C
working.
After setting all shift times, program the shifts that will be enabled for each
day of the week. The Up/Down Arrow Buttons cycle through the different
combinations of shifts, and the Left/Right Arrow Buttons cycle through the
days of the week.
This screen states that on Mondays all three shifts (A, B, and C) will be
working.
Programming Shifts - C0ntinued
This screen states that on Mondays only Shift A will be working.
After setting all shift times (previous page) and programming the shifts that
will be working for each day of the week (this page), be sure the Clock
Function is On and is set properly.
Summary of Contents for D-90
Page 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Page 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Page 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Page 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Page 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Page 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...