6-1
ValcoMelton.
SECTION 6 - OPERATION
SECTION 6 - OPERATION
SECTION 6 - OPERATION
SECTION 6 - OPERATION
SECTION 6 - OPERATION
WARNING!
WARNING!
WARNING!
WARNING!
WARNING!
It is recommended that Section 5 – Setup is read,
understood and followed before attempting to read this
section and operate the unit. OTHERWISE, SERIOUS
PERSONAL INJURY OR EQUIPMENT DAMAGE
COULD OCCUR.
This unit should only be used by qualified personnel
who understand all of the procedures and are familiar
with the necessary safety measures. Make sure that the
person operating the machine is properly protects and
that all safety instructions are followed. OTHERWISE,
SERIOUS PERSONAL INJURY OR EQUIPMENT
DAMAGE COULD OCCUR
Unit Startup
1.
Turn on the unit by turning the power disconnect switch to the
“ON” position.
Figure 6-1. Main Power Disconnect Switch
Power Disconnect Switch
ON
OFF
Summary of Contents for D-90
Page 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Page 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Page 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Page 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Page 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Page 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Page 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Page 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...