Circuit Breaker and Fuse Kit Installation
Sageon III Power System
PM990-8800-00, Rev. 9
8-2
FIGURE 8-2 AM1 TYPE BREAKER (SHOWN) KIT INSTALLATION
8.2 GJ1 TYPE BREAKER KITS
Kit Contents
Description
Quantity
GJ1 type breaker
1
Screw, Phillips Head, 10-32 x 1/2”
2
Washer, Flat, 3/8
3
Washer, Bevel, 3/8
2
Bolt, Hex Head, 3/8-16 x 1 1/4
2
Nut, Hex, 3/8-16
1
Alarm wire adapter (breaker kits 200A and over only)
1
Installing the Kit
1.
Open the distribution area door. Refer to Figure 7-1 and locate the Distribution Tier and Distribution Group where this kit
will be installed.
Note: GJ1 distribution cannot be installed in any Group of Tier 1.
2.
Remove the two painted breaker mounting bars from the existing GJ1 Distribution Option to allow access to mount the GJ1
type breaker kit (See Figure 8-3).
Note: It may be necessary to remove the 10-32 x 1/2" Phillips head screws from any GJ1 type breakers already installed in
existing GJ1 Distribution to facilitate removal of the two painted breaker mounting bars.
Distribution Assembly
Support Bracket
U-shaped Bus Bar
Installed AM1 type
breaker Kit
Note mounted
orientation:
Short Mounting Surface
Long Mounting Surface
(Output Terminal)