Sageon III Power System
Distribution Option Kit Installation
PM990-8800-00, Rev. 9
7-7
Kit Contents
Description
Kit PN
385.5882.00,
Quantity
Breaker Mounting Bracket, U-Shaped
1
Breaker Mounting Bar, 5/8" x 7-1/2"
2
Bus Bar Assembly, L-Shaped
1
Rack Screw, 12-24 x 3/4”
2
Bolt, Hex, 5/16-18 x 1”
4
Washer, bevel (Bevel), 5/16
4
Washer, Flat 5/16
4
Screw, Phillips Head, 10-32 x 1/2”
4
Alarm Wire with Ring Lug, Red
1
Fuse Alarm Jumper Wire, Orange
1
Installing the Kit
1.
Open the kit. The packing list will identify the kit by part number and name.
2.
Open the distribution area door. Refer to Figure 7-1 and locate the Group where this distribution will be placed.
3.
From the kit, collect the L-shaped bus bar and four each: 5/16-18x1” bolts, 5/16” bevel washers, 5/16” flat washers and the
red alarm wire with the ring-terminal lug.
4.
Position the L-shaped bus bar against the top of the U-shaped distribution bus in the factory installed distribution group and
align the mounting holes; see Figures 7-6 and 7-7. The upward pointing fingers with the press-in nuts should be toward the
inside of the pant. Place the ring terminal of the red alarm wire on one of the bolts. Loosely install the hardware. Do not
tighten the hardware at this time.
5.
From the kit, collect the painted U-shaped breaker mounting bracket and two 12-24x3/4” screws.
6.
Position the bracket against the nearest vertical rack rail, align the holes in the bracket with those in the rail and install the
screws. The bottom edge of the bracket extending into the pant should be approximately 1.5" (3.8 cm) above the horizontal
leg of the L-shaped bus bar.
7.
Tighten the U-shaped bracket mounting hardware. See Table 2-2 for torque specifications. Do not tighten the L-shaped bus
bar hardware at this time.
8.
From the kit, collect two painted 5/8”x7 1/2” breaker mounting bars, four 10-32 x 1/2” Phillips head screws.
9.
Refer to Figure 7-7 and loosely mount the bars on the U-shaped breaker mounting bracket.
10.
From the kit, collect the orange fuse alarm wire and temporarily drape it over the U-shaped bracket. This wire and the red
alarm wire will be connected when the GJ1 type breakers are installed.
11.
Repeat the above steps for each GJ1 distribution group to be installed.
12.
Refer to Chapter 8 to install the GJ1 circuit breakers.