Sageon III Power System
Installation
PM990-8800-00, Rev. 9
2-5
The Power system is heavy (up to 1,000 lbs (453 kg)) and it is top heavy. An improperly handled Power system can topple. Proper
handling equipment is required to transport the plant. The unit dimensions are given in Figure 2-1. Figure 2-2 shows the Power system
base and the floor mounting hole pattern.
Floor Mounting:
The Power system must be permanently anchored. Install one anchor in each floor corner. Mounting slots are
provided in each corner to allow for ease of anchoring. Mark and drill holes where shown in Figure 2-2. UNIPOWER offers several
seismic zone hardware kits.
FIGURE 2-1 POWER SYSTEM DIMENSIONS
Caution: Do not block rear panel grille. A blocked grille will limit the flow of cooling air and can
result in equipment overheating and failure. Minimum clearance behind and to the sides of the
plant must be 2" (5 cm).