Distribution Option Kit Installation
Sageon III Power System
PM990-8800-00, Rev. 9
7-2
Distribution guidelines
•
A Power system can have three tiers of distribution: Tiers 1, 2, and 3.
•
When adding distribution groups, tier 1 is factory installed (group A & B) with AM1 capability start at tier 2 upwards.
•
AM1 type breaker distribution can be located in any group.
•
GJ1 type breaker distribution must be installed as the topmost group, above all other distribution types.
•
As distribution is added, additional return bus sections (up to 3 total) may be needed to provide terminations (landings) for
load returns. See Figure 7-3. Order the return bus sections separately as needed.
TABLE 7-1 INSTALLABLE DISTRIBUTION TYPES BY TIER AND GROUP
Tier/Group,
Positions
Installable Distribution, See notes below
AM1
-48V Plant
GJ1
-48V Plant
1/A, 1-10
Y
N
1/B, 11-20
Y
N
2/A, 21-30
Y
Y²
2/B, 31-40
Y
Y²
3/A, 41-50
Y
Y²
3/B, 51-60
Y
Y²
Table Notes:
Y - Yes; indicated circuit breaker or fuse type can be installed in the group listed in the column at left.
N - No; indicated circuit breaker or fuse type cannot be installed in the group listed in the column at left.
1.
- Refer to the Distribution Guidelines above for additional information.
2.
- The GJ1 type breaker Distribution Option is an assembly that can hold up to four GJ1 type breakers.
The GJ1 Option must be the topmost distribution. Other distribution types cannot be installed above GJ1 distribution.
FIGURE 7-2 DISTRIBUTION AREA, LEFT SIDE