Installation
Sageon III Power System
PM990-8800-00, Rev. 9
2-6
FIGURE 2-2 PLANT BASE
To move and mechanically secure the Power system:
1.
Prepare the installation site. Install floor anchors (see Figure 2-2 for mounting pattern) as needed.
2.
Carefully transport the Power system to the installation site. If possible, protective wrapping should remain in place until the
move is completed.
•
Since the plant is shipped bolted to a skid, a forklift is typically used for transport to the installation site.
•
A lift point is provided in each rack corner, near the top, for an overhead crane or other lifting equipment.
•
Be careful not to bend or otherwise damage the side and rear panels.
•
Be careful not to mar or otherwise damage the front bezels.
3.
Set the Power system in place.
4.
Securely fasten the Power system to the floor.
2.5 CONNECTING AC POWER TO THE POWER SYSTEM
Connect single-phase power, through a circuit breaker, to each input in plant. See Section 1.2.7 Rectifier Specifications for voltage
and current requirements. See section 3.4 for more on connections.
A ground is required with the AC power connections for safety and for limiting EMI/RFI emissions.
User’s AC Electrical
Service Panel
Single-Phase AC
Power to Power
System
Caution: Do not block rear panel grille. A blocked grille will limit the flow of cooling air and can result in equipment
overheating and failure. Minimum clearance behind the Plant is 2" (5 cm).