Sageon III Power System
Installation
PM990-8800-00, Rev. 9
2-11
Distribution is organized by Tier (1-3), Group (A & B) and position (1-10). See Figure 2-7. The Breaker/Fuse Layout label on the rear
of the distribution area door is for recording breaker/fuse current rating and part number.
FIGURE 2-7 DISTRIBUTION GROUP IDENTITIES AND LOCATIONS
Distribution Group Orientation:
Orientation of a group determines the routing of the supply cables. Figure 2-8 shows the orientation of AM1 distribution assemblies,
using their output studs (circled) as points of reference. Groups A & B are always oriented as shown.
FIGURE 2-8 DISTRIBUTION AREA, TOP VIEW, AM1 TYPE BREAKER DIST. SHOWN
LEFT SIDE
DISTRIBUTION
GROUPS A & B
ON EACH TIER
BATTERY
DISCHARGE
BUS