Preventive Maintenance
69
Document Number 206465-0001
User Guide
Preventive Maintenance
Daily
Empty the purge bucket
Empty the purge bucket after each build has completed.
Inspect the tip wipe assembly
After each build you should inspect the tip wipe assembly to make sure there is no material build up. If
there is material build up, clean the tip wipe assembly. Material build up on the tip wipe assembly can
cause part quality issues. See
“Tip wipe assembly” on page 60
Inspect the tip shields
After each build you should inspect the tip shields for damage or material build up. If there is material build
up remove it as needed. If the material will not break free or there is damage to the tip shield, replace the
tip shield. See
“Tip shield replacement” on page 61
Remove Debris Buildup
Remove all material buildup on the Z platform and around the lead screw. Failure to do so could cause the
base to not be level or the Z platform to jam at its upper limit.
Vacuum Build Chamber
Vacuum the build chamber to remove all debris and purged material.
Clean Door
Do not use ammonia based glass cleaner on the door. It will damage the acrylic window.
500 Hour maintenance
Replace the tip wipe assembly
See “Tip wipe assembly” on page 60.
Replace the tip shields
See “Tip shield replacement” on page 61.
CAUTION
ONLY use acrylic cleaner.
Summary of Contents for 180-00108 uPrint
Page 1: ...User Guide...