47
TRAK Machine Tools
Southwestern Industries, Inc.
32240 - Printer and MMS - Installation & Printing Guide
4.
You will be asked if you want to calibrate
all channels, press “Yes”.
5.
You will be prompted to enter a mass in
grams to use for calibration, use your
calibration reference.
6.
You will be prompted to place the spool
of material used for your calibration
reference, on the channel (spool holder
bracket), one at a time for weighing.
•
Item #1 on the screen is the
calibration reference you entered.
•
Item #2 on the screen displays
the channel you would place the
spool on.
•
Item #3 on the screen is the
current weight on the channel.
7.
Let the channel reading settle (takes
about 5
–
10 seconds)
8.
Press “Commit” to save the calibration.
Repeat for each channel, until all
channels are calibrated.
9.
Press “Resume” once all the channels are
calibrated.
10.
Press “Confirm Save” to save
calibration.
11.
You are now ready to load the MMS!