9
INSPECTION
LCM 1010 Instruction Manual
[Frame Loader/Frame Unloader unit (Pitch)]
No.
Lubrication points
Lubricant
Method
Amount
Period
1 Linear rails
Grease nipples (1 locations)
Daphne Eponex grease No.2
Albania grease No. 2
Grease gun
approx.
5 g/time
6 month
Please check off the items on tiffe periodical inspection checklist.
* ^ V
9-24
TSWA
Summary of Contents for LCM1010
Page 9: ...1 GENERAL INFORMATION LCM 1010 Instruction Manual TCWA...
Page 86: ...LCM1010 Instruction Manual 5 PREPARATION TCWA 5 5...
Page 111: ...6 OPERATION LCM 1010 Instruction Manual 6 22 TCWA...
Page 191: ...3 OUTLINE OF MACHINE LCM 1010 Instruction Manual 3 12 TSWA...
Page 193: ...4 OPERATION SWITCHES AND BUTTONS LCM 1010 Instruction Manual T WA...
Page 211: ...LCM1010 Instruction Manual 5 PREPARATION TSWA 5 5...
Page 480: ...4 INSTALLATION LCM1010 Instruction Manual Factory facility 1 n il 555l I 4 52 TCWA...
Page 493: ...hoocividli Mi u r c rtoociviDLi piN mcuftoc u r m MMorum luivi iu iu instruction manual t w a...
Page 528: ...APPEND APPENDIX 1 4 CHARGE NUMBERLIST TSWA APPENDI...
Page 533: ...APPENt g APPENDIX 2 3 RedpeDataandConstantData TSWA APPENDI...
Page 549: ...4...
Page 551: ...P R E S S M O D U L E I...